Jean Talon - Tunney's Pasture

Location: 4th to 5th Floor and Basement

HydroPlumb was the mechanical contractor responsible for the piping systems.

Project Manager: SNC Lavalin Profac
Engineer: Fox Engineering
Client: P.W.G.S.C.

Click to View All Images