Jean Talon - Tunney's Pasture
Location: 4th to 5th Floor and Basement
HydroPlumb was the mechanical contractor responsible for the piping systems.
Project Manager: SNC Lavalin Profac
Engineer: Fox Engineering
Client: P.W.G.S.C.
Location: 4th to 5th Floor and Basement
HydroPlumb was the mechanical contractor responsible for the piping systems.
Project Manager: SNC Lavalin Profac
Engineer: Fox Engineering
Client: P.W.G.S.C.